Cleanroom Services

  • Cleanroom Construction (Chicago & the greater midwest area.)
  • Cleanroom HVAC Layouts
  • Cleanroom CAD Architectural Drawings
  • Schedules
  • Cleanroom Piping
  • Cleanroom Ductwork
  • Cleanroom Electrical
  • HVAC Panel Preparation
  • Schedules & Clean Protocols
  • Clean room Load Calculations
  • Efficiency Study and Power Requirements
  • Cleanroom Upgrades
  • Equipment Selection/Location
  • Local City/Municipal Permitting Preparation
  • Classification to any cleanroom standard with accompanying certificate:
    • US FED STD 209E cleanroom standards Class 1-100,000
    • ISO 14644-1 cleanroom standards 1-9
    • BS 5295 cleanroom standards 1-4
    • Fast Particle Counts: e.g. a 10x20' Cleanroom will not exceed 1 hour
    • Free travel to many Chicagoland Locations
    • Travel Fees outside of Chicagoland extra
  • Cleanroom Ceiling Fan Filter Unit Testing/Certification
    • Recommendation for HEPA Filter Replacement
    • Test Air Flow into the Cleanroom
    • No travel charge to most Chicagoland locations
    • Travel charge outside of Chicagoland area would apply
  • Cleanroom Cleaning
    • "Like-New" cleaning & restoration of ceiling, walls & floor with touch-up painting if necessary