Please Call for Pricing   

AVAILABILITY: 4-5 MONTHS


 
MODEL#: MODULAR DRY/ CLEANROOM (SAMPLE PROJECT) - CLEANROOM  
CLASS 100,000 (ISO 8) - CLEANROOM CEILING & GRID - CLEANROOM CEILING TILE - (12) 2 X 4 LIGHT FIXTURES - CLEANROOM FLOORING - (1) DEDICATED 30 TON SPLIT SYSTEM AC UNIT - (1) DEDICATED DESSICANT BASED DEHUMIDIFICATION SYSTEM - (9) 2X4 FT HEPA BLOWER UNITS - (2) MAN DOORS W/ SEALS AND ASTRAGALS - CONTROL SYSTEM FOR AC AND DEHUMIDIFICATION - PREABRICATED HOLLOW CORE AIR FLOW TYPE WALLS FREQUENTLY ASKED QUESTIONS
module assembly and test (Military Application). Dry room was needed to control temperature and humidity of environment (0-8% RH - 65-68F). With total atmostphere room ionization to control static electricity. This had prefabricated modular walls for easy on site assembly.